Setup • 10:00

Tub, Chiller, and Filtration System Setup With Frozin 400 Cold Plunge Combo

Complete setup guide for the Frozin 400 cold plunge combo including tub, chiller, and filtration system installation.

Step-by-Step

  1. 1

    Position the tub

    Place the Frozin 400 on a flat, level surface with room on one side for the chiller and access to a standard outlet and a drain or hose run-off.

  2. 2

    Install the fittings

    Attach the inlet and outlet fittings to the pre-drilled ports on the tub, tightening by hand until snug and checking the gaskets are seated.

  3. 3

    Connect the hoses

    Run the supplied hoses from the tub ports to the IN and OUT connections on the chiller, keeping the runs short and free of kinks.

  4. 4

    Attach the filtration system

    Connect the filter housing inline between the tub outlet and the chiller intake so water is filtered before it is cooled.

  5. 5

    Fill with water

    Fill the tub with roughly 100 gallons of clean water until the level sits above the ports so the pump never draws air.

  6. 6

    Power on and set temperature

    Plug in the chiller, start the pump, purge any air from the lines, then set your target temperature on the digital control (as low as 37°F).

Need More Help?

Our team is here to assist with setup, maintenance, or any questions.

Contact Support